Detail předmětu
Prices in Civil Engineering
Akademický rok 2026/27
BVA031-A předmět zařazen v 1 studijním plánu
BPA-SIS zimní semestr 3. ročník
Lectures:
- Introduction, basic terms, price, value, legislation.
- Labor standardization. Labor measurement.
- Material consumption standardization. Machine standardization.
- Labor remuneration. Wage theory.
- Cost calculation, types and classification of costs.
- Classification in construction, price systems.
- Price of a construction object - budget.
- Price of a construction object - budget.
- Public procurement - list of works, supplies and services.
- Construction price in the context of BIM.
- Cost estimates, unit price indicators,
- Summary budget of a construction project
- Price of design and engineering services.
Exercises
- Introduction, teaching program, instructions and guidelines.
- Standardization of work. Survey methods. Calculation methods.
- Standardization of material consumption. Standardization of machines.
- Calculation of construction costs.
- Itemized bill of quantities for a construction project – MCV
- Itemized bill of quantities for a construction project – MCV
- Itemized bill of quantities for a construction project – MCV
- Itemized bill of quantities for a construction project – SCV
- Itemized bill of quantities for a construction project – SCV
- Itemized bill of quantities for a construction project – SCV
- Price calculations, price indicators, summary budget.
- Calculation of design and engineering services
- Written credit test.
Learning outcomes
- Knowledge
The student is familiar with the costs and prices of construction production in a construction company, understands the principles of pricing construction work and the construction budget.
- Skills
The student can standardize and calculate the prices of construction work.
The student can compile a construction project budget from calculated items and available price lists.
- Competence
The student is able to compile a list of works, supplies and services for selecting a contractor,
The student is able to evaluate the itemized bill of quantities for a construction project.
Kredity
5 kreditů
Jazyk studia
angličtina
semestr
Garant předmětu
Zajišťuje ústav
Způsob a kritéria hodnocení
Základní literatura
Pricing system RTS, www.cenovasoustava.cz (en)
Decree No. 169/2016 Coll. on the Determination of the Scope of Documentation for Public Procurement of Construction Works and the Bill of Quantities of Construction Works, Supplies, and Services (en)
Act No. 134/2016 Coll.Public Procurement Act (en)
HANÁK, Tomáš; MATHOI, Thomas; ALB, Marianne; SCHACHNER, Katharina; VÝSKALA, Miloslav et al. Life cycle cost modelling using 6D BIM in construction: A comparative study. Online. MATEC web of conferences. 2024, vol. 396, s. 6001. ISSN 2261-236X. (en)
MIKULÍK, M.; HANÁK, T.; AIGEL, P. Errors in the list of works, supplies and services in public works tenders. Archives of Civil Engineering, 2022, roč. 68, č. 1, s. 611-622. ISSN: 1230-2945. (en)
PLEBANKIEWICZ, E.; LEŚNIAK, A.; VÍTKOVÁ, E.; HROMÁDKA, V. Models for estimating costs of public buildings maintaining – review and assessment. Archives of Civil Engineering, 2022, roč. 68, č. 1, s. 335-351. ISSN: 1230-2945. (en)
Nabízet zahraničním studentům
Předmět na webu VUT
Přednáška
13 týdnů, 2 hod./týden, nepovinné
Cvičení
13 týdnů, 2 hod./týden, povinné
Samostudium
30 týdnů, 1 hod./týden, nepovinné
Individuální příprava na ukončení
48 týdnů, 1 hod./týden, nepovinné