Construction Contract Management
Academic Year 2023/24
NVB049 course is part of 1 study plan
NPC-SIE Summer Semester 1st year
Course Guarantor
Institute
Syllabus
2.Delivery Methods, types of management and organization of the construction project.
3.Risk Allocation, design responsibility, ground conditions risk. CONS (Red Book), P&DB (Yellow Book), EPC (Silver Book).
4.Price
5.Time Management, FIDIC time schedule, CPM, acceleration, mobilization, demobilization and re-mobilization.
6.Claim Management
7.Change Management, ordered, constructive and voluntary changes, variations and value engineering in FIDIC forms.
8.Dispute Resolution, role of the Engineer, alternative dispute resolution, expert dispute resolution methods, dispute adjudication boards (DAB).
Prerequisites
Language of instruction
Czech
Credits
3 credits
Semester
Forms and criteria of assessment
Specification of controlled instruction, the form of instruction, and the form of compensation of the absences
Offered to foreign students
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
1.Standard Forms of Contracts (Fédération Internationale des Ingénieurs-Conseils and Czech standard), FIDIC.
2.Delivery Methods, types of management and organization of the construction project.
3.Risk Allocation, design responsibility, ground conditions risk. CONS (Red Book), P&DB (Yellow Book), EPC (Silver Book).
4.-5. Price
6.-7.Time Management, FIDIC time schedule, CPM, acceleration, mobilization, demobilization and re-mobilization.
8.-9. Claim Management
10.-11. Change Management, ordered, constructive and voluntary changes, variations and value engineering in FIDIC forms.
12.-13. Dispute Resolution, role of the Engineer, alternative dispute resolution, expert dispute resolution methods, dispute adjudication boards (DAB).