Course Details
Landscape Water Management Project
Academic Year 2023/24
BS007 course is part of 1 study plan
B-P-C-SI (N) / V Winter Semester 4th year
Project will solve complex watershed protection including erosion control measures for protection of agricultural land resources, water management measures for improvement of water conditions, for drainage of water, for flood control, for surface water and groundwater protection and irrigation and drainage structures. The design of small water reservoir-pond.
Course Guarantor
Institute
Objective
Ability to analyze a given problem, overview of necessary data and principles of project processing, ability to use up-to-date computing technology in project, orientation in related technical regulations and standards
Knowledge
Simlified projects with relationship to mentoined specializations.
Prerequisites
Hydraulics, hydrology, landscape water management, pedology.
Language of instruction
Czech
Credits
5 credits
Semester
winter
Forms and criteria of assessment
graded course-unit credit
Specification of controlled instruction, the form of instruction, and the form of compensation of the absences
Extent and forms are specified by guarantor’s regulation updated for every academic year.
Offered to foreign students
Not to offer
Course on BUT site
Project
13 weeks, 4 hours/week, compulsory
Syllabus
Will be subject to choosing a solution areas: Ponds - analysis of input documents, water utilization planning of reservoir, dam design, design objects. Development of simplified project documentation. Watershed protection- analysis of input documents, calculation MEO - USLE, the design erosion and water management measures, evaluate the effectiveness of the proposed measures, the development of simplified design documentation. Irrigation- analysis of input materials, design garden irrigation, irrigation design and football field, design of irrigation of the golf course, the processing of simplified design documentation. Drainage-analysis of inputs documents, design protection area adjacent to the stream before waterlogged from weir backwater and internal and external waters. Development of simplified project documentation.