1. Measurement and setting out of different methods main geometrical parameters – angle, distance, height.
2. Determination of setting-out network and setting-out spatial position of building.
3. Setting out of line structures.
4. Determination ground control points for photogrammetric and laser-scanned mass data collection.
5. Determination of height by precise levelling method.
6. Analysis of measured data and determination of accuracy characteristics.

Course Guarantor

Institute

Objective

Capability to carry out of simple setting out tasks, determination of natural marked control points. Use of GPS for determination of control.

Knowledge

Ability of setting out a simple objekt in terrain, to determinate of natural marked control points for aerial aerotriangulation. Use of GPS for determination of control.

Prerequisites

Prerequisites knowledge of basic geodetic methods of measurement, methods of data processing and their graphic representation, knowledge of basic accuracy analysis of measurement methods, determination of accuracy characteristics, knowledge of basic setting-out procedures including basic analyzes of accuracy.
Knowledge of basic mathematics, physics, geodesy, theory of errors and adjustment, mapping,
geodetic networks, geodetic software, interactive graphics systems, probability and mathematical statistics.

Language of instruction

Czech

Credits

3 credits

Semester

summer

Forms and criteria of assessment

graded course-unit credit

Specification of controlled instruction, the form of instruction, and the form of compensation of the absences

Extent and forms are specified by guarantor’s regulation updated for every academic year.

Offered to foreign students

Not to offer

Course on BUT site

Field training

1 week, 80 hours/week, compulsory

Syllabus

Preparation, assignment of tasks, reconnaissance of the terrain – 1 day. Measurement and setting out of different methods main geometrical parameters – angle, distance, height, accuracy analysis – 1 day. Determination of setting-out network and setting-out spatial position of building, accuracy analysis – 2 days. Setting out of line structures, accuracy analysis – 1 day. Determination ground control points for photogrammetric and laser-scanned mass data collection, accuracy analysis – 2 days. Determination of height by precise levelling method, accuracy analysis – 2 day. Completion, submission of the required documentation and protocols, evaluated professional discussion, written test – 1 day.