Course Details

Control outflow from river basin

DS72 course is part of 4 study plans

Ph.D. full-t. program nD > VHS compulsory-elective Winter Semester 2nd year 8 credits

Ph.D. combi. program nDK > VHS compulsory-elective Winter Semester 2nd year 8 credits

Ph.D. full-t. program nDA > VHS compulsory-elective Winter Semester 2nd year 8 credits

Ph.D. combi. program nDKA > VHS compulsory-elective Winter Semester 2nd year 8 credits

Problems of river basin runoff control in real time, regulation circuit, in-line, on-line and off-line methods, automated data collection and transmission, data filtration, water management dispatchink, operative control of supply function of water management system, operative control of river basin runoff during the floods

Course Guarantor

prof. Ing. Miloš Starý, CSc.

Institute

Institute of Landscape Water Management

Prerequisites

Basic knowledge of mathematics, physics, hydrology, reservoirs and water manangement systems (magister study level)

Planned educational activities and teaching methods

Teaching methods depend on the type of course unit as specified in the article 7 of BUT Rules for Studies and Examinations.

Objective

Knowledge needed for the design and construction of controll system of water runoff from the river basin in the frame of water management system

Specification of controlled instruction, the form of instruction, and the form of compensation of the absences

Vymezení kontrolované výuky a způsob jejího provádění stanoví každoročně aktualizovaná vyhláška garanta předmětu.

Lecture

3 hours/week, 13 weeks, elective

Syllabus of lectures

1. Problems of river basin runoff control in real time
2. Regulation circuit, in-line, on-line and off-line methods
3. Measuring items and automated data collection and transmission, data filtration
4. Water management dispatchink
5.-7. Operative control of supply function of water management system - application
8.-13. Operative control of river basin runoff during the floods
- application