Course Details
Automation of Building-Technological Design
Academic Year 2024/25
BWB005 course is part of 1 study plan
BPC-SI / S Summer Semester 4th year
Computer modelling of preparation and realisation of constructions and network analysis methods depending on phases of the design linked with construction. SW tools for design control support.
Types of introduction of links in network diagram activities with regard to the constructional stage of readiness. Source and capacity planning. Costs and financial planning. Construction procedure evidence.
Types of introduction of links in network diagram activities with regard to the constructional stage of readiness. Source and capacity planning. Costs and financial planning. Construction procedure evidence.
Credits
4 credits
Language of instruction
Czech
Semester
summer
Course Guarantor
Institute
Forms and criteria of assessment
course-unit credit and examination
Entry Knowledge
Excellent knowledge of common construction processes, at least some knowledge of special techniques and technologies, knowledge and understanding of project documentation and its content.
Aims
Providing students with the knowledge from SW support utilization for planning and management of the construction projects and modern construction organization manners by planning, engineering and supplier companies. Application of ČR and USA SW.
After successful passing of the course the students are able to operate and practically apply the available SW tools for construction preparation and erection, i.e. to elaborate a concept of itemized budget and bill of quantities; to draw, match and optimise a detailed time schedule of the building; to elaborate and optimise the diagrams of resources consumption and to make their balances for more projects.
After successful passing of the course the students are able to operate and practically apply the available SW tools for construction preparation and erection, i.e. to elaborate a concept of itemized budget and bill of quantities; to draw, match and optimise a detailed time schedule of the building; to elaborate and optimise the diagrams of resources consumption and to make their balances for more projects.
Basic Literature
ŠLANHOF, Jiří. Automatizace stavebně technologického projektování (studijní opora). VUT v Brně, Fakulta stavební, 2009.
(cs)
Jarský, Č. Automatizovaná příprava a řízení realizace staveb, manuál CONTEC (součást instalace). Jarský, Č, 2003. (cs)
Krejčí, Luboš. Rozpočtování staveb. ČKAIT 2013, ISBN 978-80-87438-39-8. (cs)
(cs)
Jarský, Č. Automatizovaná příprava a řízení realizace staveb, manuál CONTEC (součást instalace). Jarský, Č, 2003. (cs)
Krejčí, Luboš. Rozpočtování staveb. ČKAIT 2013, ISBN 978-80-87438-39-8. (cs)
Recommended Reading
Jarský, Č., Musil, F., Svoboda ,P., Gašparík, J., Motyčka, V., Pospíchal, V. Kovářová, B., Vyčítal, M. Příprava a realizace staveb. Cerm s.r.o. Brno, 2019. (cs)
FOSTER, Jack Stroud. Structure & Fabric 2. PEARSON, 2006. ISBN 0131970968
(en)
Microsoft. Microsoft Project 2017, reference manual. Microsoft, 2017.
(en)
TICHÁ, Alena a kol.. Rozpočtování a kalkulace ve výstavbě I, II. CERM, s.r.o., 2008. ISBN 978-80-7204-587-7
(cs)
BEHREMS, Werner a HAWRANEK M., Peter. Manual for the preparation of industrial feasibility studies. United Nations Industrial Development Organization, 1991. 9211062691 (en)
FOSTER, Jack Stroud. Structure & Fabric 2. PEARSON, 2006. ISBN 0131970968
(en)
Microsoft. Microsoft Project 2017, reference manual. Microsoft, 2017.
(en)
TICHÁ, Alena a kol.. Rozpočtování a kalkulace ve výstavbě I, II. CERM, s.r.o., 2008. ISBN 978-80-7204-587-7
(cs)
BEHREMS, Werner a HAWRANEK M., Peter. Manual for the preparation of industrial feasibility studies. United Nations Industrial Development Organization, 1991. 9211062691 (en)
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Production classification in reference to the SW tools for cost calculation and time planning.
- 2. Possibilities of Build-Power, Oferta, Kros and Koral system application in contracting of execution and the construction execution.
- 3. Movement of materials, ancillary budgetary costs and their importance during budget preparation.
- 4. Individual calculations.
- 5. Modelling of construction execution, use of the CONTEC programme.
- 6. Activities in network graphs, Critical Path Method.
- 7. Links among activities – building readiness.
- 8. Method utilising network charts in the construction technology field.
- 9. Deadline, source, capacity, cost and financial planning.
- 10. Updating the construction technology model.
- 11. Automation of the production of documents related to the preparation of construction work.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Introduction to the course, individual assignment of projects, regulations of the PC room.
- 2. Introduction to BUILDpower: foundation work, budget filing, setting of the budget parameters.
- 3. Opening, import, deletion, export, types of items, searching items.
- 4. Creation of bill of quantities, independent work on individually assigned budget.
- 5. Calculation according to technical and economical indicators, independent work on individually assigned budget.
- 6. Schedule according to budget and calculations, independent work on individually assigned budget.
- 7. Introduction to network analysis, introduction to the use of CONTEC software: file management, project set up, individual assignment for individual work throughout the semester.
- 8. Set up and creation of a model, link practice, starting work on individually assigned project.
- 9. Use of standard network graphs, improvement of network graphs, updating according to the construction phase in progress, resources demand graph, work on the individual assignment of network analysis.
- 10. Aggregation of structural and technological projects, optimization according to the limit of resources, evaluation of resources in several projects, control and test plans, environment plan, recapitulation according to stages and contractors, independent work on individually assigned work regarding network analysis.
- 11. Presentation of results of the term project, defence of the project results, credits.