Course Details
Rehabilitation of Water Infrastructure
Academic Year 2024/25
BPA010 course is part of 1 study plan
BPC-SI / V Summer Semester 4th year
The course deals with conception problems of solving rehabilitation of water and sewer systems (water mains, sewerage), planning methods, survey methods of current conditions, overview of trenchless technology methods use for rehabilitation of water mains and sewerage systems focused on local repairs, general repairs of networks and new line and repairs of objects.
Credits
5 credits
Language of instruction
Czech
Semester
summer
Course Guarantor
Institute
Forms and criteria of assessment
course-unit credit and examination
Entry Knowledge
Utility Networks, Water Supply, Wastewater collection.
Aims
- Knowledge about standards and regulations, pipe material and material used at rehabilitation, inspection and failure detection of water and sewer pipes, cleaning of water and sewer pipes
- Design of rehabilitation methods
Student will manage to design of restoration plan and technical design and planning of rehabilitation of water and sewer networks and design of nodig rehabilitation technologies.
- Design of rehabilitation methods
Student will manage to design of restoration plan and technical design and planning of rehabilitation of water and sewer networks and design of nodig rehabilitation technologies.
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
- 1. Introduction, basic indicators of the technical condition of sewerage network, sewerage and drainage - basic information.
- 2. Maintenance and cleaning of sewer networks, failure of sewerage networks and sewage connections.
- 3. Inspection, classification and assessment of the condition of sewer system.
- 4. Repair of sewer systems and sewer connections.
- 5. Renovation of sewer systems and sewer connections.
- 6. Replacement and construction of sewer systems and sewer connections.
- 7. Technical condition of water networks.
- 8. Repair of water supply networks.
- 9. Renovation of water supply networks.
- 10. Replacement and construction of water networks.
- 11. Plans for rehabilitation of water and sewer networks.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
- 1. Video presentation – Paris sewer system, discussion.
- 2. The technique used in the exploration of sewer networks, technology presentations, discussions.
- 3. Evaluation of camera survey by CCTV video recording.
- 4. Project – Rehabilitation of selected parts of the sewer system 1.
- 5. Project – Rehabilitation of selected parts of the sewer system 2.
- 6. Project – Rehabilitation of selected parts of the sewer system 3.
- 7. Evaluation of the technical condition of water mains.
- 8. Project – Rehabilitation of selected parts of the water network 1.
- 9. Project – Rehabilitation of selected parts of the water network 2.
- 10. Practical examples of technologies – discussion.
- 11. Credit.