Project Sewerages and WWTP

Academic Year 2026/27

BPA011 course is part of 1 study plan

BPC-SI / V Summer Semester 4th year

The aim of the subject is to extend and practise theoretical knowledge and practical design proficiency that is obtained earlier in subjects “Sewerage” and “Wastewater treatment”. In the frame of the comprehensive project is solved urban runoff drainage and safe treatment of all types of wastewater in the real catchment area. Students propose a project documentation of sewerage network and wastewater treatment plant. Drawing documentation includes technical report and detailed hydrotechnic and technologic calculations. Students use computers and current software.

Credits

4 credits

Language of instruction

Czech

Semester

summer

Course Guarantor

Institute

Forms and criteria of assessment

graded course-unit credit

Entry Knowledge

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Offered to foreign students

Not to offer

Course on BUT site

Project

13 weeks, 2 hours/week, compulsory

Syllabus

1. Project assignment, provision of supporting documents
2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet
3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report
4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report
5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report
6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report
7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater
8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules
9. Processing of JES - Unified Environmental Statement
10. Preparation of the thesis presentation, completion of the project
11. Credit, defense of the project