Course Details

Project Sewerages and WWTP

Academic Year 2025/26

BPA011 course is part of 1 study plan

BPC-SI / V Summer Semester 4th year

The subject expands and practices theoretical knowledge and practical design skills that are acquired in the subjects Drainage and Wastewater Treatment. The project deals with drainage for a family house with a sewer connection and a domestic wastewater treatment plant in a real area of ​​interest. The project is prepared in the form of project documentation according to Decree No. 131/2024 Coll. on construction documentation.

Credits

4 credits

Language of instruction

Czech

Semester

summer

Course Guarantor

Institute

Forms and criteria of assessment

graded course-unit credit

Entry Knowledge

Hydraulics, Hydrology, Engineering nets, Sewerage Systems, Chemistry and Water Technology, Treatment of waste water

Aims

The basic conception solution and design of drainage urban areas and treatment of waste-water from urban areas.

Offered to foreign students

Not to offer

Course on BUT site

Project

13 weeks, 2 hours/week, compulsory

Syllabus

1. Project assignment, provision of supporting documents
2. Processing of the drawing "Situation of wider relations", calculation of sewage flow, processing of the Accompanying sheet
3. Processing of the drawings "Sample cross-section of pipe laying" and "Equipment of sewer shaft", calculation of flow rates and concentrations at the domestic sewage treatment plant, processing of the Technical report
4. Processing of the drawings "Cadastral situation drawing" and "Longitudinal profile of sewage pipework", calculation of the main volumes of the domestic sewage treatment plant, processing of the Technical report
5. Processing of the drawing "Domestic sewage treatment plant", assessment of the pollution balance, processing of the Technical report
6. Processing of the drawing "Technological scheme of the sewage treatment plant", calculation of the infiltration device, processing of the Technical report
7. Processing of the drawing "Coordination situation" and "Wastewater discharge facility", processing of the Application for permission for discharged wastewater
8. Processing of the drawings "Drawing of foundations for domestic sewage treatment plant" and "Drawing of foundations of sewage treatment plant" shafts", WWTP Operating Rules
9. Processing of JES - Unified Environmental Statement
10. Preparation of the thesis presentation, completion of the project
11. Credit, defense of the project