Course Details
Land Consolidation
Academic Year 2023/24
GE30 course is part of 1 study plan
B-P-C-GK / GI Summer Semester 3rd year
History and purpose of reallocation of land (PU), PU in other states. Terminology. Land offices. PU forming environment. Form of PU. Specification and reconstruction of portioning, unfinished reintegration. Complex reallocation of land. Data and preliminary work: choice of cadastral territory, proceeding PU, perimeter of land being improved, boarders course recognition, opening discussion, land survey and analysing current state, surveying current state. Quality soil ecological units (BPEJ). Inventory of ground landlord’s claim. Common areas plan: road system, water-management precautions, anti soil erosion precautions. Common areas plan: road system, water-management precautions, anti soil erosion precautions. Soil type optimisation, optimal layout of suggested lots, quality suitability and suitability of detachment land areas, easement establishment. Land office arbitrate. Realization. Balance. Common areas construction.Documentation of LC results, LC Cadastral matriculation.
Credits
3 credits
Language of instruction
Czech
Semester
summer
Course Guarantor
Institute
Forms and criteria of assessment
graded course-unit credit
Entry Knowledge
Principles of cadastre, coordinate calculations, determination of areas, work with CAD
Knowledge of setting works and special geodesy.
Knowledge of setting works and special geodesy.
Basic Literature
Pekárek M. , Dudová J., Hanák J., Průchová I., Tkáčiková J.: Pozemkové právo. MUNI, ISBN 978-80-210-7536-8 (cs)
Jonáš F. a kol.: Pozemkové úpravy. Státní zemědělské nakladatelství (SZN), 1990 (cs)
ÚZ - Katastr nemovitostí, zeměměřictví, Pozemkové úpravy a úřady – Úplné znění zákonů, vyhlášek a vládních nařízení. (cs)
Jonáš F. a kol.: Pozemkové úpravy. Státní zemědělské nakladatelství (SZN), 1990 (cs)
ÚZ - Katastr nemovitostí, zeměměřictví, Pozemkové úpravy a úřady – Úplné znění zákonů, vyhlášek a vládních nařízení. (cs)
Syllabus
1. Purpose of land consolidation.
2. Land offices.
3. LC forming environment. Form of LC.
4. Specification and reconstruction of portioning, unfinished reintegration.
5. Complex reallocation of land. Preliminary work.
6. Landscape stability ecology system (USES).
7. Common areas plan: road system, water-management precautions, anti soil erosion precautions.
8. Soil type optimisation, optimal layout of suggested lots, quality suitability and suitability of detachment land areas, easement establishment.
9.Land office arbitrate. Realization. Balance. Common areas construction.Documentation of LC results, LC Cadastral matriculation.
2. Land offices.
3. LC forming environment. Form of LC.
4. Specification and reconstruction of portioning, unfinished reintegration.
5. Complex reallocation of land. Preliminary work.
6. Landscape stability ecology system (USES).
7. Common areas plan: road system, water-management precautions, anti soil erosion precautions.
8. Soil type optimisation, optimal layout of suggested lots, quality suitability and suitability of detachment land areas, easement establishment.
9.Land office arbitrate. Realization. Balance. Common areas construction.Documentation of LC results, LC Cadastral matriculation.
Prerequisites
Principles of cadastre, coordinate calculations, determination of areas, work with CAD
Knowledge of setting works and special geodesy.
Knowledge of setting works and special geodesy.
Specification of controlled instruction, the form of instruction, and the form of compensation of the absences
Extent and forms are specified by guarantor’s regulation updated for every academic year.
Offered to foreign students
Not to offer
Course on BUT site
Lecture
13 weeks, 2 hours/week, elective
Syllabus
1. Purpose of land consolidation.
2. Land offices.
3. LC forming environment. Form of LC.
4. Specification and reconstruction of portioning, unfinished reintegration.
5. Complex reallocation of land. Preliminary work.
6. Landscape stability ecology system (USES).
7. Common areas plan: road system, water-management precautions, anti soil erosion precautions.
8. Soil type optimisation, optimal layout of suggested lots, quality suitability and suitability of detachment land areas, easement establishment.
9.Land office arbitrate. Realization. Balance. Common areas construction.Documentation of LC results, LC Cadastral matriculation.
2. Land offices.
3. LC forming environment. Form of LC.
4. Specification and reconstruction of portioning, unfinished reintegration.
5. Complex reallocation of land. Preliminary work.
6. Landscape stability ecology system (USES).
7. Common areas plan: road system, water-management precautions, anti soil erosion precautions.
8. Soil type optimisation, optimal layout of suggested lots, quality suitability and suitability of detachment land areas, easement establishment.
9.Land office arbitrate. Realization. Balance. Common areas construction.Documentation of LC results, LC Cadastral matriculation.
Exercise
13 weeks, 2 hours/week, compulsory
Syllabus
1. Separation of lands.
2. Separation of lands.
3. Design of perimeter of land consolidation.
4. Design of perimeter of land consolidation.
5. Compostion of claims of land owners.
6. Compostion of claims of land owners.
7. Layout of suggested lots.
8. Layout of suggested lots.
9. Influence of erosion.
2. Separation of lands.
3. Design of perimeter of land consolidation.
4. Design of perimeter of land consolidation.
5. Compostion of claims of land owners.
6. Compostion of claims of land owners.
7. Layout of suggested lots.
8. Layout of suggested lots.
9. Influence of erosion.