Science and research - Currently solved projects
Specific Academic Research

Calibration of Rail Temperature Measuring Device
Investigator: Ing. Tomáš Říha
Duration of the project: 2012 - 2013

Non-linear Bending Moment Analysis of Concrete Sleepers and Verification by Measuring "In Situ"
Investigator: Ing. Dana Hubáčková
Duration of the project: 2012 - 2013
Projects supported by Technology Agency of the Czech Republic (TAČR)
Increasing the quality of track in switches by flexibility - project TA01031297
BUT Investigator: prof. Ing. Jaroslav Smutný, Ph.D.
Other participants: prof. Ing. Luboš Pazdera, CSc., doc. Ing. Otto Plášek, Ph.D.
Duration of the project: 2011 - 2015
Development of hybrid railway bridge resistant in flood lands - project TA02030380
BUT Investigator: doc. Ing. Otto Plášek, Ph.D.
Other participants: Ph.D., doc. Ing. Aleš Dráb, Ph.D., doc. Ing. Vlastislav Salajka, CSc.
Duration of the project: 2012 - 2014

Sleepers with under sleeper pads - projekt TA01031173
BUT Investigator: doc. Ing. Otto Plášek, Ph.D.
Other BUT participants: Ing. Miroslava Hruzíková, Ph.D., prof. Ing. Jaroslav Smutný, Ph.D., Ing. Richard Svoboda, Ph.D.
Duration of the project: 2011 - 2013
Projects supported by Universities Expansion Fund (FRVŠ)

Acoustics-Vibrations Tuition Laboratory Innovation - project 797_2012 - A
Investigators: prof. Ing. Jaroslav Smutný, Ph.D., Ing. Dagmar Donaťáková, prof. Ing. Luboš Pazdera, CSc.
Duration of the project: 2012
Projects supported by European Social Fund and Ministry of Education, Youth and Sports
Education for Competitiveness Operational Programme, support area 2.2

Central European Centre for the development and realization of
innovative technical and economic study programs (CEPRI) - project
CZ.1.07/2.2.00/28.0301
Investigator: doc. Ing. Jan Jandora, Ph.D.
Other participants from Institute of Railway Srtuctures and Constructions: Ing. Richard Svoboda, Ph.D.
Duration of the project: 2012 - 2015